About us
Parete was founded in 2003. Branches was set up in main cities in China to provide the system solutions to customers in ceiling, partition and access floor.
In 2010, Parete had built a new factory in Changzhou to satisfy the developing requirements of access floor. Parete reconstruct the team to strengthen the innovation culture, research & development, technical services and the competiveness of exporting.
Parete anti-static access floor and raised floor system have been used in manage landmark projects in China. Parete have accumulated much experience in application in computer room, monitoring room, IT data center, cleaning room, commercial cabling raised floor application.
Parete access floor have been exported to 23 countries in the world. Guangzhou is the export center. Parete will continue to provide the best quality products to the customers from different countries.
Advantages
High quality raw material
Parete access floor use the high quality raw material. Parete will not lower the standard to reduce to cost. Parete ensure the cement, galvanized steel shell, floor coverings and accessories in best quality to consist a high quality access floor system.
Quality Control
Parete takes strict control during the production of access floor. ISO9001:2000 have been strictly conducted from the procurement of raw material, factory management, production control, environment protection, logistic service, technical service and after service etc. Quality is the life of Parete.
Technical service
Parete have built a technical service team to help the customer to choose, design and apply the Parete access floor products in a right way. Parete will share the experience in product applications to the customers by technical service. Service is the extension of Parete Value to customer.
Green and environment
ISO14001 environment certificated system have been built to improve the management of environment and safety in production. Parete insists on procuring the environment raw material, and built the dust recycle system. The waste water will be treat to a high draining standard. Parete try to build a waste access floor recycle system.